Submarine Cable Repair Capacities - Works
Europese Commissie
Organisaties die reparatiecapaciteiten voor onderzeese kabels willen opbouwen.
Ook bekend als CEF-DIG-2026-CABLE-REPAIR-CAPACITIES-WORKS, CEF-DIG-2026-CABLE-REPAIR-CAPACITIES, Submarine Cable Repair Capacities
Waar is deze subsidie voor?
Expected Impact: The expected benefits of the supported project: Provide quick response to emergency situations identified by the relevant Regional Cable Hub or other entity declaring the emergency situation (Key Performance Indicator). Provide quick average estimated time-to-repair for cable systems in the targeted EU sea basins with at least one landing point in an EU territory (Key Performance Indicator). Increase operational repair capacity in the main European sea basins (Key Performance Indicator). Strengthen the resilience of cable systems in the main European sea basins. Ensure digital sovereignty and strategic autonomy of the EU in the main European sea basins. Objective: This call aims to enhance emergency response capacities and the resilience of backbone networks’ infrastructures by supporting the development and deployment of adaptable repair modules for swift emergency repair operations, enabling quick response to incidents that could severely impact the Union or its Member States. The goal of the EU is to fund modules covering the main sea basins of the Union, the objective being to develop adaptable repair modules that can be deployed on existing vessels, as well as the necessary related operational capabilities. The modules are expected to be rapidly operational in order to re-establish the service of submarine cables (through repair or substitution) in emergency situations, i.e. where the cut or the failure of the cable can cause a severe damage to one or mo…
Voor wie is het bedoeld?
Organisaties die reparatiecapaciteiten voor onderzeese kabels willen opbouwen.
Waarvoor kunt u subsidie krijgen?
- Onderzeese kabel reparatie
- Noodrespons digitale infrastructuur
- Netwerkresilience versterken
- Kabelreparatie modules
Voorwaarden
- Applicants must be public entities with emergency response mandate (civil protection, national emergency response agencies, coastguards, military navies)
- Modules can only be used to respond to emergency situations declared by competent authority
- At least three pre-configured vessels must be identified
- Vessels must be flat deck vessels capable of receiving modules with minor adaptation
- Modules must be ready for intervention and operational within 3 days of vessel arrival
- Proposals must demonstrate adaptability, portability and scalability of the solution
- Lease or service level agreement required for third-party vessels guaranteeing availability for at least 10 years
- Repair modules must serve all EU Member States in main European sea basins following current repair agreements
Kom ik in aanmerking?
De eisen uit de regeling. Uw situatie bepaalt of u voldoet; dit is geen beschikking.
Zo vraagt u aan
Zoals beschreven door de verstrekker. Onvolledig? Controleer altijd het officiële loket.
Benodigde documenten
- Letter of Support van de bevoegde autoriteit
- Proposal demonstrating adaptability, portability and scalability of the solution
- Details on lease or service level agreement for third-party vessels
- Implementation plan including vessel specifications, project phasing, governance, allocation policies, and financial aspects
Aan te leveren gegevens
- Identification of at least three pre-configured vessels
- Details on how vessels are pre-configured or plans for pre-configuration
- Number of pre-configured vessels to be made available
- Demonstration of contribution to CPEI Area 8 and relevant CPEI criteria
- Repair modules specifications for all subsea cable systems in main European sea basins
Applicants must be public entities with emergency response mandate (civil protection, national emergency response agencies, coastguards, military navies); coordination with Regional Cable Hubs required; modules must be operational within 3
Naar het aanvraagloketOpenstellingen en rondes
- Start
- 23 jun 2026
- Sluit
- 8 okt 2026
- Budget
- -
- Verdeling
- Tender
Bronnen en actualiteit
“Expected Impact: The expected benefits of the supported project: Provide quick response to emergency situations identified by the relevant Regional Cable Hub or other entity declaring the emergency situation (Key Performance Indicator). Provide quick average estimated time-to-repair for cable system…”
Geen openbare bronnen beschikbaar.
Deze informatie is geautomatiseerd samengesteld uit officiële bronnen en kan onvolledig zijn. Controleer details bij de verstrekker. Elk hard feit toont een citaat uit de brontekst.